Starting Monday, Bridge Security will no longer be available at DIA

The screening equipment will remain in place in case there is an urgent need, but the lanes will not be staffed and the checkpoint will no longer be operational.

Leave a Reply

Your email address will not be published. Required fields are marked *

Adspot
http://Its%20and%20Bits%20Crafts%20SuppliesIts and Bits Crafts Supplies
Enable Notifications OK No thanks